Jump to content

Rayman615

Members
  • Posts

    27
  • Joined

  • Last visited

Posts posted by Rayman615

  1. If this is the stone next to the raspberry punch the best way to get the most foundations on that rock is start on the south edge in the middle so you are not too low or too high off the ground.  I have a full 8 x 12 here with shorter sections attached as you follow the curve of the rock. You will need to place some foundations into the rock below the visible surface but they can be removed with the blueprint removal debug.

  2. While the tables and other furniture we have already are great it would be cool to have half height walls and half wide floors as well. Just got done building a shopping area and the half height walls combined with half wide floors wood make for great counter tops. I know we can kind of do half high walls if we snap a wall low but on a second floor it will be sticking down into the ceiling of the first floor.

    • Thanks 1
×
×
  • Create New...